Construction Claims Management Toolkit
Notify, substantiate and settle claims under FIDIC 1999 & 2017.
A knowledge hub for construction managers, planners, engineers, QSs, contract administrators, PMO leads and consultants — built around the Construction Management Excellence Framework by Ahmed Albasry.
Forms, Excel workbooks and field guides for every discipline — from $19 each.

Worth $249 if bought separately · Save $160 (64%)

Notify, substantiate and settle claims under FIDIC 1999 & 2017.

One number, one document, for the life of the project.

One owner, one date, one deliverable — and a record of what was decided, and why.

16 project management plans, ready to adapt and issue.
Instant PDF download from trianglepmo.org, or order the paperback on Amazon.

Leading People, Projects, PMOs and Performance
Preview — watermarked sample pages

Estimating, Budgeting, Forecasting & Controlling Project Costs from Tender to Closeout
Preview — watermarked sample pages

A Practical Handbook for Construction Managers, Site Leaders & Project Teams
The complete construction management reference — from feasibility to handover. Structured frameworks, programme and cost control, team leadership, and project close-out. Plan Smart. Build Right. Finish Strong.
By Ahmed Albasry, MSc CM · MCIOB · PMP® · CM-Lean
PMP® Exam Prep 2026 — 479 original questions, 81 chapters, 3 full mock exams, and 40 named traps. The S.C.A.N. method decodes any question in 40 seconds. Mapped to all 26 ECO tasks with correct weightings 33/41/26. PMBOK® Guide — Eighth Edition.
By Ahmed Albasry, PMP® · MCIOB · CM Lean · "Think, Don't Memorise."

100 field-tested tips every construction professional should know — from the first site walk to final account. By Ahmed Albasry, MSc CM · MCIOB · PMP®.
Field guide · Second to none · Instant digital download
A practical system for building a risk register that actually gets used — identify, quantify, own and close out risk on live construction projects.
Secure checkout · Instant digital download

13 categories of construction, PMO, controls, risk, cost, procurement, contract, quality, HSE, site, planning, PMBOK and lessons-learned templates.
In-depth, practitioner articles across PMBOK 8, Lean, Digital Construction, claims, leadership and more.
CPI, SPI, EAC, TCPI, CV, SV, risk exposure, contingency, productivity, utilisation and procurement savings.
Nine structured pathways from fundamentals to advanced — Lean, EVM, Claims, PMBOK 8, Digital Construction, PMO.
Searchable studies across buildings, infrastructure, transport, commercial, industrial and government projects.
Project failure database, mega-project lessons, claims library, recovery playbooks and PMO dashboards.
Construction-only AI copilot with cited sources — ask any PM, contract, controls or claims question in plain language.
Practice PMP-style questions across PMBOK 8 performance domains with instant explanations.
NotebookLM episodes across all 12 construction-PM disciplines — from planning to PMBOK to lessons learned.
Long-form books and the founder profile of Ahmed Albasry — creator of the CME Framework.
Day-to-day site management tools: daily reports, monthly reports, snag lists and handover packs.
Open categoryGovernance, dashboards, reporting cadence and steering pack templates for project management offices.
Open categoryEVM tracker, cost control log, schedule baseline workbook and integrated reporting cadence.
Open categoryRegister, heat map, response strategy and quantitative contingency modelling.
Open categoryBudget vs actual, change order log, EAC forecast and cash flow.
Open categoryPrequalification, scope matrix, RFI log, submittal log and tender evaluation.
Open categoryA practical guide to construction project delivery methods — Design–Bid–Build, Design & Build, EPC, Construction Management, Management Contracting, ECI, IPD, Alliancing and PPP. Who carries which risk, which projects each method suits, and real examples from Sydney to Heathrow to Auckland.
What a construction PMO actually delivers — the three PMI models, owner-side versus contractor-side, the eight things a good PMO does, why most fail, and five tests for whether yours is working.
A practical guide to construction bonds across the project lifecycle — bid, performance, advance payment, retention, payment and defects liability bonds. On-demand vs conditional, typical values, expiry management and the mistakes that cost real money.
Nine structured tracks from fundamentals to advanced. Pick your gap; the curriculum is field-tested.
Buildings, infrastructure, transport, commercial, industrial, government — each with the leading signal that was missed (or caught).

Ahmed is the creator of the Construction Management Excellence Framework and brings 20+ years of construction experience across high-density residential, commercial and infrastructure programmes. Triangle PM is the platform he uses to publish the templates, tools, articles and books he wishes had existed when he was learning the craft.